Building a Deck on Uneven Ground | DoItYourself.comMaking use of the plan for your deck, mark out the perimeter of the structure by means of wooden stakes, which you will drive into the ground every few feet. Tie a string tightly in between the stakes. Step 2 - Excavating the Area Using a pick and shovel, dig out the soil in the deck area to a uniform depth.

How to Build a Deck on Sloped or Uneven Ground | Decks.com ...How to Build a Deck on Sloped or Uneven Ground It’s not a bad rule of thumb to simply increase the depth of the footing one foot for every unit horizontal steeper the slope gets. Between 3:1 and 2:1 slopes, a minimum of two feet deep, and between 2:1 and 1:1 slopes, no less than 3 feet deep.

Tips for Building a Deck on a Sloped Site | Better Homes ...If the deck is only 1 or 2 feet above fairly level ground, you can build simple stairs using precut stringers available at home centers. If the deck is higher or the ground slopes, careful planning is required to make sure that all the steps (including the bottom one) are the same height.

How to Build an Elevated Deck on Uneven Ground - Dengarden ...The posts near the stairs are on higher ground that the ones on the other side by almost a foot. From one side of the stairs to the other is a 10 1/2-inch slope. Measure, measure, and measure again to ensure your deck is good and level. Remember, the plywood that will cover this will raise the height another 3/4 of an inch.

Building a Floating Deck on Uneven Ground (My first Deck ...Finally took some time during quarantine to complete a much needed deck rebuild to accompany our shed. This is a floating style 8 x 12 deck that was built ov...

How To Lay Decking On Soil Or Grass | RonsealUse a flat surface (a decking board or tamper is perfect for this) and place a spirit level on top to check the ground is even. If the spirit level indicates the ground is uneven, level it out with extra soil or compact the soil to flatten it out. Now here are your two options for laying your decking.

Building a Deck on Sloped GroundLearning CenterHead to the top of the slope and dig two holes in the foundation deep enough so that you can find solid soil, which may be down a foot or two, and 1 foot in diameter. The holes will help support a side of the deck.

Tips for Building Deck Stairs on Uneven Ground ...The best way to approach this when you're working on uneven ground is to build and put the deck frame in position first. Then, put them on temporary supports. Professionals called this "post-and-beam" support, which means you build the outer frame first.

How to Build Stairs for a Deck on a Sloped Site | Better ...Slip a 2x4 toe-kick under the inside stringers and against the insides of the outside stringers. Drill holes through the toe-kick; then drill holes into the landing using a masonry bit. Fasten the toe-kick to the landing with bolts and anchors or masonry screws.

How to Build a Deck Without Digging Holes | Home Guides ...Stand the board you're using for the front of the frame for the deck and one of the boards you're using for the side of the frame on their 2-inch edges. Position them together to form an L shape....

How to Build a Ground Level Deck - Hoosier HomemadeStart by building your outer frame, using AC2 pressure treated lumber. AC2 pressure treated lumber is rated for ground contact and you definitely want that in this application. Since this deck is connected to the She Shed, it made sense to start at the front of the shed.

How to Lay Out a Deck on Un-Level Ground | Home Guides ...The initial phase of building a deck over a slope or on un-level ground includes stringing lines at the perimeter and installing the concrete footings or piers for posts that support the deck...

How to Build a Deck - The Seven TrustSecure the top of the stringers to the deck with hangers. Build the upper and lower stair runs in place with decking planks for treads (and toe kicks if desired). Secure the bottom of the stringers to the concrete landing pad. Attach cleats between the stringers and secure them to the pad with anchor bolts.

How to lay decking on uneven ground: 2 Simple methodsTo build a decking base on sloped uneven ground: Clear the area of all grass, weeds and debris using a good quality spade Dig 1ft deep post holes Set the posts using post mix so that the top is at or slightly above the desired height

How to Build a Ground Level Deck | Decks.com by Seven Trust Since a ground level deck does not require safety railings or stairs to access, the cost to build one is comparatively lower than building an elevated deck in terms of both materials and labor. Ground level decks set outdoor living spaces apart and give you a beautiful area to add chairs, potted plants, and even a grill for entertaining.

How to Build a Shed Base On Uneven Ground Ideas That WorksPutting up a shed base on uneven ground can be a little challenging. For the majority of people, this isn’t an issue. So, if you will be building a shed base on flat ground, read on to learn how to build a shed foundation on uneven ground that will be solid and last.